Items where Division is "Praktik Kerja Lapangan (PKL) Teknik Sipil" and Year is 2024
A
Andani, Naufal Seno (2024) LAPORAN PRAKTIK KERJA LAPANGAN EVALUASI RENCANA ANGGARAN BIAYA PEKERJAAN KOLOM, BALOK & PLAT LANTAI PADA PROYEK PEMBANGUNAN GEDUNG BANK MANDIRI CABANG KOTA BLITAR. Other. Universitas Islam Balitar, Blitar. (Unpublished)
C
Cahyo, Viki Dwi (2024) ANALISIS DAN IMPLEMENTASI SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) PADA PEKERJAAN JALAN: STUDI KASUS PROYEK REKONSTRUKSI JALAN BANTUR – WONOGORO KAB. MALANG. Technical Report. UNIVERSITAS ISLAM BALITAR. (Unpublished)
K
Khasana, Mar'atul and Rakhmawati, Nilla and Mardiansyah, Wahyu Sigit and Putra, Ilham Ardiana (2024) METODE PELAKSANAAN PEKERJAAN PASANGAN LANTAI 3 PROYEK PEMBANGUNAN PONDOK YAYASAN PENDIDIKAN ISLAM AL-MAHMUD PONGGOK KABUPATEN BLITAR. Technical Report. UNIVERSITAS ISLAM BALITAR BLITAR. (Unpublished)
L
Lioenita, Anggie Mega (2024) METODE PELAKSANAAN PEKERJAAN SLOOF PADA PROYEK PEMBANGUNAN GEDUNG START-UP BADAN LAYANAN UMUM UNIVERSITAS ISLAM NEGERI SAYYID ALI RAHMATULLAH TULUNGANGUNG. Technical Report. UNIVERSITAS ISLAM BALITAR, BLITAR. (Unpublished)
M
Mardiansyah, Wahyu Sigit (2024) METODE PELAKSANAAN PEKERJAAN KOLOM DAN BALOK LANTAI 3 DI YAYASAN PENDIDIKAN ISLAM AL MAHMUD PONGGOK KABUPATEN BLITAR. Technical Report. UNIVERSITAS ISLAM BALITAR,BLITAR. (Unpublished)
Muhammad Yakhyal Quluub, Yahya (2024) METODE PELAKSANAAN PEKERJAAN BALOK LANTAI 4 PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT AULIA LODOYO KABUPATEN BLITAR. Technical Report. UNIVERSITAS ISLAM BALITAR, BLITAR. (Unpublished)
P
Prasetyo, Doni (2024) PELAKSANAAN PEKERJAAN STRUKTUR KOLOM PADA GEDUNG WORKSHOP IPS RSUD NGUDI WALUYO WLINGI KABUPATEN BLITAR PRAKTIK KERJA LAPANGAN. Technical Report. UNIVERSITAS ISLAM BALITAR. (Unpublished)
Pratama, Aditya Lucky (2024) METODE PELAKSANAAN PEKERJAAN BETON STRUKTUR PADA PROYEK PEMBANGUNAN GEDUNG START UP BADAN LAYANAN UMUM UNIVERSITAS ISLAM NEGERI SAYYID ALI RAHMATULLAH TULUNGAGUNG. Technical Report. Universitas Islam Balitar, Blitar. (Unpublished)
R
Rakhmawati, Nilla and Khasana, Mar'atul and Mardiansyah, Wahyu Sigit and Putra, Ilham Ardiana (2024) METODE PELAKSANAAN PEKERJAAN KUSEN DAN PINTU LANTAI 3 PROYEK BANGUNAN GEDUNG PONDOK YPI AL – MAHMUD PONGGOK KABUPATEN BLITAR. Technical Report. UNIVERSITAS ISLAM BALITAR, BLITAR. (Unpublished)
Rohmatulloh, Gisca Bagus (2024) STUDI PELAKSANAAN KOLOM PROYEK BANGUNAN GEDUNG BADAN LAYANAN UMUM (BLU) UIN SAYYID ALI RAHMATULLAH TULUNGAGUNG. Technical Report. Universitas Islam Balitar. (Unpublished)
Rossalina, Maria (2024) PELAKSANAAN PEMBANGUNAN INSFRASTRUKTUR PENGUATAN JALAN JEMBATAN RUAS JALAN ABDUL FATAH KABUPATEN TULUNGAGUNG. Technical Report. UNIVERSITAS ISLAM BALITAR, BLITAR. (Unpublished)
Roziq, Fachri Ainur (2024) Metode Pelaksanaan Pekerjaan Kolom Lantai 4 Pada Proyek Pembangunan Gedung Rumah Sakit Aulia Kecamatan Lodoyo Kabupaten Blitar. Technical Report. Universitas Islam Balitar, Blitar. (Unpublished)